Dryer capacity is often quoted as “kg/h” of product. That number is meaningless until you define whether it is feed, dry product or water evaporated — and at what inlet and outlet moisture.

Evaporation load (water removed per hour) is the quantity that actually drives dryer size, heat duty and air volume. This guide shows how to calculate it from plant data, how to relate it to product throughput, and what to send manufacturers so quotations are comparable.

1. What You Are Calculating

TermMeaningWhy it matters
Feed rateMass of wet material entering the dryer per hourStarting point for mass balance
Product rateMass of material leaving at target residual moistureOften the sales or packing basis
Evaporation loadMass of water (or solvent) removed per hourPrimary sizing driver for thermal dryers
Dryer “capacity”Must be defined on a stated basis (feed, product or evaporation)Prevents undersize/oversize errors

Always state moisture on a clear basis: wet basis (moisture as % of total wet mass) is most common in industrial drying discussions; dry basis is used in some engineering calculations. Do not mix them in one formula.

2. Core Mass Balance (Wet Basis)

Define:

  • FFF = feed rate (kg/h wet)
  • XiX_iXi​ = inlet moisture fraction (wet basis), e.g. 0.40 for 40%
  • XoX_oXo​ = outlet moisture fraction (wet basis), e.g. 0.08 for 8%
  • PPP = product rate (kg/h at outlet moisture)
  • EEE = evaporation load (kg water/h)

Dry solids are conserved (no solids loss assumed):

F (1−Xi)=P (1−Xo)F \, (1 – X_i) = P \, (1 – X_o)F(1−Xi​)=P(1−Xo​)

So product rate:

P=F⋅(1−Xi)(1−Xo)P = F \cdot \frac{(1 – X_i)}{(1 – X_o)}P=F⋅(1−Xo​)(1−Xi​)​

Evaporation load:

E=F−PE = F – PE=F−P

or equivalently:

E=F⋅(Xi−Xo)(1−Xo)E = F \cdot \frac{(X_i – X_o)}{(1 – X_o)}E=F⋅(1−Xo​)(Xi​−Xo​)​

These relations are the foundation of dryer capacity calculation.

3. Worked Logic (Illustrative Structure Only)

Example structure (replace with your numbers):

  • Feed: F=1000F = 1000F=1000 kg/h at Xi=0.50X_i = 0.50Xi​=0.50 (50% wet basis)
  • Target outlet: Xo=0.10X_o = 0.10Xo​=0.10 (10% wet basis)

Dry solids in:

1000×(1−0.50)=500 kg/h1000 \times (1 – 0.50) = 500 \text{ kg/h}1000×(1−0.50)=500 kg/h

Product out:

P=500/(1−0.10)=555.6 kg/hP = 500 / (1 – 0.10) = 555.6 \text{ kg/h}P=500/(1−0.10)=555.6 kg/h

Evaporation:

E=1000−555.6=444.4 kg water/hE = 1000 – 555.6 = 444.4 \text{ kg water/h}E=1000−555.6=444.4 kg water/h

Same result:

E=1000×(0.50−0.10)(1−0.10)=444.4 kg/hE = 1000 \times \frac{(0.50 – 0.10)}{(1 – 0.10)} = 444.4 \text{ kg/h}E=1000×(1−0.10)(0.50−0.10)​=444.4 kg/h

Use your measured feed rate and lab moisture values. Do not treat any example as a design guarantee.

4. If You Know Product Rate Instead of Feed Rate

Often packing or sales is planned on finished product:

F=P⋅(1−Xo)(1−Xi)F = P \cdot \frac{(1 – X_o)}{(1 – X_i)}F=P⋅(1−Xi​)(1−Xo​)​

E=P⋅(Xi−Xo)(1−Xi)E = P \cdot \frac{(X_i – X_o)}{(1 – X_i)}E=P⋅(1−Xi​)(Xi​−Xo​)​

Choose the form that matches the data you actually measure in the plant.

5. Wet Basis vs Dry Basis (Avoid This Confusion)

  • Wet basis moisture XXX: water mass / total wet mass
  • Dry basis moisture WWW: water mass / dry solids mass

Conversion:

W=X1−X,X=W1+WW = \frac{X}{1 – X}, \quad X = \frac{W}{1 + W}W=1−XX​,X=1+WW​

Evaporation load can also be written using dry solids rate S=F(1−Xi)S = F(1-X_i)S=F(1−Xi​):

E=S (Wi−Wo)E = S \, (W_i – W_o)E=S(Wi​−Wo​)

Pick one system of units and stay consistent in every spreadsheet and RFQ.

6. From Evaporation Load to Dryer Capacity

Manufacturers size thermal dryers primarily on:

  1. Evaporation load EEE (kg water/h)
  2. Allowable product temperature and residence time (quality)
  3. Feed form (how material is dispersed or layered)
  4. Heat source and ambient conditions
  5. Required residual-moisture uniformity

A quote that says only “500 kg/h dryer” without stating feed moisture, product moisture and whether 500 is feed or product is not a capacity specification.

Practical rule for RFQs
State either:

  • Feed rate + XiX_iXi​ + XoX_oXo​, or
  • Product rate + XiX_iXi​ + XoX_oXo​

and ask the supplier to confirm the evaporation load they have used.

7. Factors That Change the Number You Must Design For

FactorEffect on required capacity
Seasonal peak feed rateSize for peak, not only average
Inlet moisture variationHigher XiX_iXi​ → higher EEE for same solids rate
Tighter residual moistureLower XoX_oXo​ → slightly higher EEE and more finish-zone duty
Solids loss / fines carryoverReal product rate may be less than ideal mass balance
Batch vs continuousContinuous: steady EEE; batch: peak rate during the drying phase
Multiple productsCalculate EEE for each; design for the governing case

Build a small table: minimum / normal / peak for FFF or PPP and for XiX_iXi​. Design conversations should reference the peak credible evaporation load.

8. Heat Duty (Order-of-Magnitude Link)

Evaporation load connects to approximate thermal demand:

Qlat≈E×ΔHvQ_{\text{lat}} \approx E \times \Delta H_vQlat​≈E×ΔHv​

where ΔHv\Delta H_vΔHv​ is the latent heat of vaporisation (plus any practical allowance for heating solids, air and losses). Real heater duty is higher than pure latent heat because of:

  • Heating of dry solids and residual water
  • Heating of drying air
  • Exhaust enthalpy leaving the system
  • Radiation and leakage losses
  • Possible solvent heats of vaporisation different from water

Detailed heat balance is manufacturer engineering work. Your job as a buyer is to supply accurate EEE and process limits so that balance is realistic.

9. Common Calculation Mistakes

MistakeConsequence
Mixing wet-basis and dry-basis moistures in one equationWrong EEE by a large margin
Using “kg/h” without saying feed or productUndersized or oversized dryer
Designing only on average rateFailure at peak season
Ignoring inlet moisture variationChronic capacity shortfall on wet days
Assuming catalogue capacity equals your dutyTechnology or zone design may not match feed form
Forgetting that lower XoX_oXo​ increases EEEFinish drying and energy under-estimated

10. Checklist: Data to Calculate Load and to Send Manufacturers

For your own calculation

  • Feed rate or product rate (state which)
  • Inlet moisture (wet or dry basis — state which)
  • Target outlet moisture (same basis)
  • Peak vs average throughput
  • Product identity and feed form (slurry, cake, granules, slices)

To request a comparable dryer proposal

  • The above moisture and rate data
  • Maximum product temperature or quality limits
  • Available heat source
  • Material of construction / hygiene needs
  • Emission or hazard constraints
  • Preferred technology family if known (or ask for recommendation)

With evaporation load and feed form clear, manufacturers can propose spray, flash/spin-flash, fluid bed, band or rotary systems on a shared basis.

11. How GTI Dryers Uses These Calculations

GTI Dryers sizes and selects continuous drying systems from process data. Evaporation load, feed form and residual-moisture targets drive:

  • Technology recommendation
  • Approximate thermal and air-handling duty
  • Multi-zone or single-pass configuration where relevant
  • Budgetary and detailed engineering discussions

GTI does not treat a generic “kg/h” label as a specification. Calculations are only as good as the moisture and rate data supplied; pilot tests are recommended when feed behaviour is uncertain.

Geographic Note

Ambient humidity, altitude and seasonal feed moisture affect real dryer performance and fan/heater margins. The mass-balance formulas for EEE remain the same worldwide; site conditions are applied in detailed design. Always recalculate peak EEE with local harvest or process variation in mind.

Frequently Asked Questions

What is the most important number for dryer sizing?
Evaporation load (kg water/h) at stated inlet and outlet moisture, together with feed form and quality limits.

Can I size a dryer from product rate alone?
Only if you also know inlet and outlet moisture so EEE can be calculated.

Should I use peak or average capacity?
Design discussions should include peak credible evaporation load; operating strategy can address average efficiency.

Does residual moisture of 5% vs 8% change much?
It changes EEE and especially the difficulty of the final drying stage. Always use the real specification.

What should I send GTI for a capacity assessment?
Feed or product rate, inlet and target moisture (with basis), feed form, peak factor and any temperature or hygiene limits.

Next Step

If you are defining dryer capacity for a new line or a bottleneck upgrade, calculate evaporation load with the formulas above (or share raw rate and moisture data). GTI can review the numbers, confirm the load basis and recommend a suitable dryer type and configuration for your plant.

Request a dryer capacity & evaporation load assessment with your process data.

Contact the GTI Technical Team:

Website: gtidryers.com

Email: mktg@gtidryers.com

Phone / WhatsApp: +91 9330077417

Chat on WhatsApp